Project Portfolio
White Rose Project:
Subsea Manifolds - Technip CSO
- Main Contractor, FEED, Sept. 2001
- Integrated Project Team for Detail Engineering
- Northern Drill Centre
- 2 Gas Inj. Wells
- 1 Gas Inj. Flowline
- 1 Chem Inj./Control Umbil.
- Central Drill Centre
- 8 Prod. Wells
- 5 Water Inj.
- Prod. & Test, Water Inj., Gas Lift Flowlines
- 1 Chem. Inj./Control Umbil
- Southern Drill Centre
- 6 Prod. Wells
- 5 Water Inj.
- Prod. & Test, Water Inj., Gas Lift Flowlines
- 1 Chem. Inj./Control Umbil